A plant needed an air conditioning system as its production was slowing down due to continuous labor breaks.
Equipment required:
1 chiller
2 air handlers
Obstacles:
limited space
Challenge:
A plant needed an air conditioning system as its production was slowing down due to continuous labor breaks.
Plant and labor size needed to be analyzed to determine the equipment required to stabilize the plant’s climate and drop the temperature to enable continuous workflow.