INSTITUTIONAL

Challenge:

A hospital’s new cooling system was malfunctioning and was in need of a fast and temporary solution.

Equipment required:

2 chillers

Duration of installation:

4 days

Challenge:

A hospital’s new cooling system was malfunctioning and was in need of a fast and temporary solution.

The solution to this case was to offer the hospital a redundancy system. Where our equipment replaced their new system.

Equipment required:

2 chillers

Duration of installation:

4 days